boand3
boand3 boand3
  • 04-05-2018
  • Mathematics
contestada

A construction company needs to remove 2 1/6 tons of dirt from a construction site. They can remove 7/8 tons of dirt each hour. What is the total number of hours it will take to remove the dirt?

Respuesta :

jupjupjupjup202 jupjupjupjup202
  • 04-05-2018
The answer is 4.

Hope I helped :)
Answer Link

Otras preguntas

A car starts from rest and travels for 4.0s with a uniform acceleration of + 1.3m/s^2. The driver then applies the brakes, causing a uniform acceleration of - 1
Cuanto vale la y en matemáticas
-15p+32p please awnser its rsm hw
1.08 to the 3rd power?
Cuanto vale la y en matemáticas
100° 100⁰ X = ??????
PLEASE HELP!! Whats the lifestyle or entertainment in The Odyssey? (I need it for a newspaper project so please answer w a good explanation)
how many molecules of oxygen is in water
Write an expression to describe the sequence below. Use n to represent the position of a term in the sequence, where n = 1 for the first term.–77, –76, –75, –74
Question 2 (4 points) Draw in a complementary set of nucleotides on the right side of the figure below to produce the double-stranded structure of DNA. You'll h