An average of 2,000 charts need to be coded each month. if it takes an average of 15 minutes to code each chart— how many charts does the average coder code per 8-hour day?

Respuesta :

Bea1111 Bea1111
  • 01-05-2017
Put 8 hours into minutes which is 60•8= 480.
Then divide 480 by 15 to find how many charts are coded in 8 hours by a coder.
480/15= 32.

So the average worker codes 32 charts per 8-hour work day.
Answer Link

Otras preguntas

If a hot air balloon has an initial volume of 1000 L at 50 ∘C, what is the temperature (in ∘C) of the air inside the balloon if the volume expands to 1700 L ?
How do I solve bh+hr=25 when solving for b
which of the following is a correct equation for the line passing through the point (-3,2) and having slope m=2/3. Check all that apply. A.) y-2=2/3(x+3)B.) 2x-
Subtracting decimals: 2.54 subtract 1.67
A major result of the european age of exploration was
Write the ratio 7/8 :14 as a fraction in its simplest form
In the wake of thr civil war, compared to the south the north A. Had sustained verry little distruction B. Had to create a new labor union system C. Had more ec
inayah spent 566 minutes combing her hair last week using six different kinds of combs. how many minutes did she spend using each comb
In the equation x=−3y, what is the unit rate?
Round 63.3 to the nearest tenth