mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

The price of the game is 60$. The sales tax though is 7% What will the cost of the game be
I NEED YOUR HELP PLZ HELP ME!! Energy produced by cellular processes is stored as. A lipids B proteins C deoxyrbonucleic acids D complex carbohydrate
Need help with this question
I don’t understand! Please help
Mark had 2 packs of erasers with the same number earasers in each pack . He gives 6 erasers away . Mark has 18 erasers . How many does mark have in each pack
Melting snow ponds and water found in rolls are examples of
tastes bitter acid or base
the worship of a god who is omniscient, omnipotent, omnipresent is called?A. Polytheism B. A scared mythC. MonotheismD. A pagan myth
Which statements are true about the ordered pair (−4, 0) and the system of equations? {2x+y=−8x−y=−4 Select each correct answer. The ordered pair (−4
I wish I _ my way around these Parisian streets. To make the sentence subjunctive in mood the word that belongs in the blank is will know, had known, knew,