maddiebraverman5481 maddiebraverman5481
  • 04-01-2022
  • SAT
contestada

If 24 electricians can wire some new houses in 15 days, how many electricians would be required to do the job in 12 days?.

Respuesta :

shishirshrestha989
shishirshrestha989 shishirshrestha989
  • 04-01-2022

Answer:

here,

electrician/days

24 - 15

x(let). -12

direct proportion,

then,

exchange X up 24 down

or,24*15=12*X

or,24*15divided by 12=X

X=30

hence,30 electrician required to do complete in 12 days

Answer Link

Otras preguntas

How does the white witch escape aslan's creatures?
Which characteristics belong to a eukaryote? is usually multicellular contains a nucleus contains one cell type contains membrane-bound organelles
The LCD of 1/2 and 3/4 is 4 how would u rewrite 1/2 using the LCD as the denominator
How many representatives does california have?
The measure of one of two complementary angles is 6 degrees less than one half the measure of the other. Find the measure of the smaller angle
What does the preamble to the constitution state??
If a tree falls in a forest and no one is around. does it still make a sound?
After serving as the commander of us forces in europe, dwight d. eisenhower a became the supreme commander of the allied expeditionary force. b served in the p
Find the distance between the points on the coordinate plane. points i and c. a.-2 b.2c.4
What is measured by a wave period