razz25
razz25 razz25
  • 03-05-2021
  • Mathematics
contestada

ramesh can complete a piece of work in 10 days he worked for 4 days and left. if dinesh complete the remaining part of the work ,how much work was done by dinesh​

Respuesta :

rylaneckst rylaneckst
  • 05-05-2021

Answer:

100% of the work was done by him

Answer Link

Otras preguntas

what is the value of x?
The sum of a number and five more than the number is 17. What is the number?
Narrative works are ________ texts. 1 expository 2 persuasive 3 informal
Me acosté temprano ______________________ y me levanté temprano hoy por la mañana.
The ancient Mayans used the sinkholes in the Yucatán Peninsula as _____.
How do you multiply mixed numbers?
Which statement best explain the similarities between the philosophical of John Locke and Jean Jacques Rousseau
I need help on my makeup up work numbers 4-6
a dinosaur fossil is 128 320 000 years old how can you express this age in scientific notation with the highest level of precision
1. Is the following system consistent or inconsistent? 8x + y + 4 = 0 y = -8x - 4 2. Is the following system consistent or inconsistent? 7x + 6 = -2y -1