maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

How did the alliances that formed in Europe after world war 2 form an "iron curtain" as described by Winston Churchill in a 1946 speech?
How did New England's physical geography help the growth of industries?
There is a turtle race. The race will last 2 minutes. I have to find the distance from the start each turtle will be at the end of the race. Speed (in inches pe
next term in sequence 61, 122, 244, 488
The discovery of gold in Transvaal contributed to the start of _____?the Anglo-Boer WarWorld War IIWorld War Ithe Peloponnesian War
y varies directly as x. if x=5 when y=12 find x when y=30
sophia has 3 pink tulips and 3 white tulips. what fraction of sophias tulips are pink
What is bigger fraction, 5/6 or 6/7
how could you compare the energy carried in two different longitudinal waves
how could you compare the energy carried in two different longitudinal waves