afaye28
afaye28 afaye28
  • 01-02-2021
  • Physics
contestada

PLS HELP
Determine the quantity of work done when a crane lifts a 200-N block from 2 m above the ground to 6 m above the ground.

Respuesta :

alicialuster alicialuster
  • 01-02-2021
Ok do 200x2 then divide by 6
Answer Link

Otras preguntas

bakit nanakop ang kanlurang asy a
The point u(4,-1) is reflected over the x axis
definition of populism​
A Narrative essay on I wish I had listened to my mother ​
in which structure is the most glucose absorbed into the blood
23. A candidate who gets 36% marks in an examination fails by 24 marks but another candidate, who gets 43% marks, gets 18 more marks than the minimum pass marks
Peter runs 200 m in 30 s, while his sister Eva runs 300 m in 36 s. a) Who is the faster runner? Explain how you can tell. b) At the same rate, how far will each
One may not claim the additional costs from the parents or guardians of uninvited children, to a wedding of social event. An invitation to a social gathering co
One may not claim the additional costs from the parents or guardians of uninvited children, to a wedding of social event. An invitation to a social gathering co
One of the acute angles of a right triangle is 36 degrees. Find the other acute angle.