neivialfaro neivialfaro
  • 01-09-2020
  • Computers and Technology
contestada

You work for a company that is losing sales because it takes days to manufacture products. What technology can you suggest the company use to speed production?

Respuesta :

fatboipear
fatboipear fatboipear
  • 01-09-2020

Answer:

i guess artificial intelligence or robots

Answer Link

Otras preguntas

Can the sum of two mixed numbers be equal to 2 ? Explain why or why not.
what were the 4 major causes of imperialism?
help help help help!
The outermost tissue of a tree trunk that is 6 feet in diameter would most likely be (A) epidermis (B) cork (C) cortex (D) phloem (E) xylem
You are given an aqueous solution of NaCl. The simplest method for the separation of NaCl from the solution is (A) evaporation of the solution to dryness (B) c
During a recent winter, the ratio of deer to foxes was 7 to 3 in a town. If there was 210 foxes in the town, what was the number of deer in the town?
what is the density of a orange if its mass is 158.2 g and the volume is 106 mL
Write -90.85 as a mixed number in simplest form.
What is the velocity of an object that has a mass of 2.5 kilogram and a momentum of 1,000 kg·m/sec?
what are the differences between german and english schools