it took 20 000 workers to build taj mahal in 20 years how long would it take to build if they had 8,000 workers

Respuesta :

coltongarretttanner coltongarretttanner
  • 01-05-2020

Answer:

50 years

Step-by-step explanation:

Answer Link
whyme533249
whyme533249 whyme533249
  • 01-05-2020

Answer:

160 years

Step-by-step explanation:

20/20000=0.001

0.001 x 8 x 20 = 160

Answer Link

Otras preguntas

what are the two things that characterize the practice of science
One method for studying opportunity cost Is to think I'm in terms of what
previewing is a method used to
What are the three main parts of the geosphere? A. atmosphere, crust, core B. lithosphere, mantle, core C. crust, mantle, core D. asthenosphere, lithosphere,
A participle is a verb form that is used as a(n) ______________. a. noun. b. adjective. c. preposition. d. conjunction. 2. Identify the participial phra
What interests you the most about Social Psychology? What do you think is one of the most aggravating issues that our society faces nowadays?
A rectangular prism is completely packed with 200 cubes of edge length fraction 1 over 5 inch, without any gap or overlap. Which of these best describes the vol
two brown-eyed parents have produced three blue-eyed sons. what can be concluded about the parents?a)only the father carries an allele for blue eyes. b)only the
How Do I convert 3pi/4 to degrees?
What role does pyruvic acid play in cellular respiration?