Sadeghshakeri97 Sadeghshakeri97
  • 02-12-2019
  • Mathematics
contestada

60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

Let S u, v be a linearly independent set. Prove that the {u + v,u - v} is linearly independent
A 64.4-kg firefighter climbs a flight of stairs 21.3-m high. How much work (in J) does he do?
WILL GIVE BRAINLIEST!The table below shows part of the texting skills’ data collected by the cell phone company.Use the table to interpret the axes labels of th
Can someone please help me out ?
If a compiler detects a violation of language rules, it refuses to translate the class to ____. a. machine code b. a logic error c. an application d. Java
Which expression is equivalent to 2a+1/10a-5 / 10a/4a^2-1
Which is the standard form of the equation of the parabola that has a vertex of (3,1) and a directrix of x= -2?
You recently interviewed a candidate for a position in your sales department. Another candidate, who was more qualified, received the job. Which of the followin
Which country is located directly south of mongolia
Summarize the steps of the scientific method.