Why is the monitoring and controlling phase extremely important to the success of the project

Respuesta :

zdgzr
zdgzr zdgzr
  • 22-01-2020

Answer: It is the only way to ensure that work plan estimates are on track and that early intervention can take place.

Explanation: APEX

Answer Link

Otras preguntas

How did the American population shift in the 1940s and 1950s? A. many people left the city to live in the suburbs B. large numbers of poor, southern whites migr
Line segment DCOE is a diameter of circle O, line segment AB is a chord of the circle, and line segment OD is perpendicular to line segment AB at C. If AB=8 an
How did the integrated circuit effect the development of computers? It allowed computers to be freely programmed. It allowed the use of totally electronic compu
How many days are in 7.5 years
Which of these sentences is punctuated correctly? (5 points) I need to leave for school right now; because I don't have all of my school supplies gathered. I ne
What is (10/3) squared?
What is the homophone to the word Except
(LC)Which weapon caused the fewest casualties in World War I? A machine gun B artillery C airplane D bayonet WRONG
64 fl oz = ? cups (64 fl oz is equal to how many cups?) (and explain your answer)
methamphetamines are a type of drug that affects the brain by A. causing the release of excess dopamine. B. blocking the production of dopamine. C. increasing t